PROJECT DETAILS

  • Project Details:

    Demolition of Building 5 at PCC Rock Creek Campus and light excavation

  • General contractor :

    Fortis Construction

  • Start date :

    June 2012

  • Status :

    Completed

  • Duration :

    Approximately 2 years

Northwest Infrastructure’s partnership with Fortis Construction is a direct result of PCC’s goal to reinvest bond dollars into the local economy, mentor smaller construction companies and spread work and opportunities to minority and women-owned businesses and local vendors. We excavated a site for a temporary parking area on the south side of the campus. In addition, the gymnasium in Building 5 was left intact – and in active use – while NWI demolished the surrounding L-shaped structure and hauled the material away. NWI, called it “a delicate operation” to protect the gym while performing the work which was made even trickier by the discovery of wasps in the roof.

  • Demolition
  • Excavation
  • Trucking