Grand Avenue Apartments

  • Project details :

    Construction of a 12 story apartment building providing low income affordable housing in the heart of Portland

  • General contractor :

    Walsh Construction

  • Start Date :

    November 2017

  • Status :

    In Progress- Estimated Completion Date: (September 2018)

  • Duration :

    Approximately 2 years

The Grand Avenue Apartments will be Portland’s largest single-building affordable housing project since the 286-unit Hollywood East complex that was built in 1969. When completed in 2020, it will offer 240 units including studios, 1 bedroom and 2-bedroom apartments. NWI performed the excavation & utilities work on this project along with providing the necessary tools for Walsh Construction & O’Neill Electric when required. The first phase of excavation was creating a rock pad for a large drill rig to set steel beams deep into the ground. NWI then exported thousands of yards of dirt from the site to start forming structure work and concrete pours. The major underground utilities on this project consisted of a pipe bursting process to an existing pipe run on Grand Avenue roughly 15 ft deep. NWI hired Interlaken Construction to perform this work and supplied the trucks, material, and other equipment to complete the project.

  • Excavation
  • Trucking
  • Underground Utilities